Parts Diagram; Assembly & Installation; Installation - NewAir AC-12000E Owner's Manual

Newair ac-12000 portable air conditioner owners manual
Hide thumbs Also See for AC-12000E:
Table of Contents

Advertisement

PARTS DIAGRAM

1. Control panel
2. Louvers
3. Carrying handles
ASSEMBLY & INSTALLATION

INSTALLATION

Before connecting the appliance to a power source, let it stand upright for approximately 2 hours.
This will reduce the possibility of a malfunction in the cooling system from handling during
transportation.
L
OCATION
 The air conditioner should be placed on a firm foundation to minimize noise and vibration.
 The unit has casters to aid placement, but it should only be rolled on smooth, flat surfaces. Use caution
when rolling on carpet surfaces. Do not attempt to roll the unit over objects.
 The unit must be placed within reach of a properly rated grounded socket.
 Never place any obstacles around the air inlet or outlet of the unit.
 Allow 14 inches to 40 inches of space from the wall to the window for efficient air conditioning.
7
4. Casters
5. Air filter
6. Air inlet
Count On NewAir
7. Cord storage
8. Exhaust air outlet
9. Water plug/drainage port

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac-12000hAc-12000

Table of Contents