Robnet Network Cables; Figure 4-12 Ap35 Bracket Mounting - Simrad AP35 Instruction Manual

Table of Contents

Advertisement

• Remove the Control unit, drill the 4 mounting holes in the mounting
• Unbolt the temporarily fitted bracket halves and screw them to the
• Assemble the complete bracket again and adjust the control head to best
• Connect the Robnet cables to the control unit connectors (See note on

ROBNET network cables

As Robnet units have 2 Robnet connectors they can be used as "jack points"
for further expansion of the system. There are no dedicated "in" or "out"
connectors. You may connect the cables to any available Robnet connector
on the specific unit.
The Robnet cables are available in 7 and 15 m length and provided with 6
pin male connector at one or both ends. The 15 m cable to the junction unit
has connector only at the control unit end.
Optional extension cable (10 m) is available and have a male and a female
connector.
When installing a system, try to minimize total Robnet cable length by
connecting all Robnet units to the nearest available Robnet connector.
Total length of Robnet cable installed in a system should not exceed 50 m
(165').
Examples of interconnecting Robnet units:
22083083H
surface.
mounting surface.
viewing angle and tighten up the mounting bracket bolts.
next page).

Figure 4-12 AP35 Bracket mounting

Installation
55

Advertisement

Table of Contents
loading

Table of Contents