Heat & Glo Revo-V12 Installation Manual page 52

Heat & glo direct vent heater installation manual
Hide thumbs Also See for Revo-V12:
Table of Contents

Advertisement

CORRUGATED
TEMPLATE INSTALLED
GAS
ACCESS
ELECTRICAL
ACCESS
Figure 11.2 In-Wall with Corrugated Template
52
Heat & Glo • REVO-V12, REVO-S21, REVO-H31 Installation Manual • 2273-980 Rev. G • 9/14
NOTE: USE BLOCKS TO ACHIEVE
2 INCH DEPTH FOR POSITION OF
CORRUGATED TEMPLATE.
CORRUGATED TEMPLATE FLUSH WITH BOTTOM STUD AND
CENTERED LEFT TO RIGHT BETWEEN VERTICAL STUDS
TOP VIEW
BLOCKS
TEMPLATE
(DASHED LINES)
2 IN.
Z=1-3 IN.
HARD-PIPED GAS
CONNECTION
TERMINATION
GAS ACCESS
ELECTRICAL ACCESS
Z DIMENSION =OPTIMAL
HARD-PIPED GAS DEPTH 1-3 IN.
VERTICAL STUDS
BOTTOM STUD

Advertisement

Table of Contents
loading

This manual is also suitable for:

Revo-s21Revo-h31

Table of Contents