Heat & Glo Revo-V12 Installation Manual page 23

Heat & glo direct vent heater installation manual
Hide thumbs Also See for Revo-V12:
Table of Contents

Advertisement

Vertical Termination - (continued)
Three Elbows
V
2
H
2
Figure 4.12
Heat & Glo • REVO-V12, REVO-S21, REVO-H31 Installation Manual • 2273-980 Rev. G • 9/14
H
V
1
V
Minimum
1
2 ft
610 mm
6 ft
3 ft
914 mm
9 ft
4 ft
1.4 m
12 ft
5 ft
1.5 m
14 ft*
6 ft
1.8 m
14 ft*
7 ft
2.1 m
14 ft*
V1 + V2 + H1 + H2 = 40 ft (12.2 m) Maximum
V
= 2 ft (610 mm) Minimum
Total
* : REVO-S21 & REVO-H31= 14 ft. (4.3 m) Maximum
Total
: REVO-V12 = 12 ft. (3.7 m) Maximum
H
+ H
Maximum
1
2
1.8 m
2.7 m
3.6 m
4.3 m*
4.3 m*
4.3 m*
H
1
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Revo-s21Revo-h31

Table of Contents