Blodgett DFG-100 Installation Operating & Maintenance Manual page 10

Gas convection ovens
Table of Contents

Advertisement

Installation
ventilation
diRect fLUe aRRangeMent
When the installation of a mechanically driven exhaust
hood is impractical the oven may be vented by a direct
flue arrangement.
WaRning!!
It is essential that the direct flue be installed
as follows. incorrect installation will result in
unsatisfactory baking and oven damage.
The flue must be class B or better. The height of the flue
should rise 6-8 ft (2-2.5 m) above the roof of the build-
ing or any proximate structure. Never direct vent the oven
into a hood. The flue should be capped with a UL Listed
type vent cap to isolate the unit from external environ-
mental conditions.
The direct vent cannot replace air consumed and vented
by the oven. Provisions must be made to supply the room
with sufficient make-up air. Total make-up air require-
ments for each oven section should be approximately 30
CFM (.85 m3) per section. To increase the supply air en-
tering the room, a ventilation expert should be consulted.
fLUe diaMeteR
oven
DFG-100
6" (15cm)
DFG-200
6" (15cm)
single
double
6" (15cm)
8" (20cm)
installing the draft hood
Ovens ordered for direct venting are supplied with a draft
hood. Install the draft hood as follows:
1. Place the draft hood over the flue connector.
2. Secure both ends with the sheet metal screws pro-
vided.
8
Flue
Drafthood
Front of
Oven
figure 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dfg-200Dfg-100-esDfg-200-es

Table of Contents