Lifting Preparation - Invacare RPS350-1E Owner's Operating And Maintenance Manual

Invacare stand up lift owner's operating and maintenance manual
Hide thumbs Also See for RPS350-1E:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
NOTE: A battery needing to be fully recharged will take
approximately six (6) hours.
4. Lift UP on the handle on the top of the battery.
5. Lift the battery UP and OUT away from battery charger.
WARNING
Make sure there is an audible click when
mounting battery on the control box to
confirm proper mounting. Otherwise, in-
jury or damage may occur. Refer to FIG-
URE 5 for correct mounting.
6. Reinstall the battery onto the control box as shown in
FIGURE 5. Make sure there is an audible click.
Handle
(STEPS
1, 2, 4
and 5)

LIFTING PREPARATION

Refer to the patient sling Owner's Manual, 1023891
for complete lifting preparation information.
Battery
Audible Click
(STEPS 3
and 6)
FIGURE 5 - CHARGING BATTERIES
9
OPERATION
Battery
Charger
(STEP 3)
O
P
E
R
A
T
I
Control Box
O
(STEP 6)
N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents