B) Indoor Unit And Mounting; C) Outdoor Unit Location & Mounting; Indoor Units; Locating Unit - York Mr. Slim PK-1.6FLA Technical & Service Manual

Table of Contents

Advertisement

Installation Instructions

Indoor Units

Connect the duct connections to unit supply and return air ducts.
Refer to GA drawing for unit supply and return duct connection sizes and locations.
Use canvas connection between unit & supply air duct to avoid the transmission of vibration to the duct.
Don't run the unit without filter on return air side.
Avoid abnormal duct size increases and reductions. It can adversely affects air and cooling performance.
When electrical heater is installed, use fireproof canvas (or similar heat resistance material) between duct & unit
discharge connection.
Do the proper duct sizing for air quantity (L/s or cfm) recommended at various External Static Pressures.
All ducting should be insulated properly to avoid heat transfer.
All ducts should be secured properly to building structural opening should be sealed properly to avoid any air
leakage or condensation.
All main branch ducts (without 90° elbow) should be acoustically lined up to min. 10 ft length with the help of all
perforated sheet & fiber glass insulation of recommended density & thickness.
Ensure Room thermostat fixed at proper location, sensing return air or room temperatures and set the thermostat
not less than 70° F.
Outdoor Unit Location and Mounting

Locating Unit

Consult local building codes or ordinances for special installation requirements.
Unit must be lifted by 2" pipe hook rigging sling in base rail, use spreader bar to prevent the sling from damaging
the unit.
A minimum clearance of 1 m on serviceable side, 300 mm for air inlets on all sides and 1.5 m for air discharge (unit
top) is required.
The unit must be located outdoor only and cannot be connected to duct work.
The metal parts of the unit if subjected to salt spray, fog or mist in seacoast areas could lead to rapid
corrosion/oxidation and may lead to premature failure.
Interconnecting tubing.
Vapor and Liquid lines.
Keep all lines sealed until connection is made.
Make connections at the indoor coil first.
In dual circuit units, ensure Liquid & Suction tubes at indoor & out door units are brazed to
corresponding systems.
Connect the filter drier and sight glass at the liquid line in the flow direction marked on the components.
Perform the Leak check at all the brazed and flare joints.
Perform system Evacuation up to 200 microns.
Factory charged unit is sufficient for 25 feet of interconnecting tubing.
Maximum length of lines
The maximum equivalent length of interconnecting line is 200 feet. Always use the shortest length
possible with minimum number of bends.
If the application call for more length of piping, please contact our sales officer.
Sizing
Please refer the Guideline for inter connecting piping.
COMMERCIAL DUCTED SPLITS
07

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents