Installation Planning; Vertical Termination; Horizontal Termination - Vermont Castings VHLDV500 Installation And Operating Instructions Manual

Resolution direct vent gas fireplace
Table of Contents

Advertisement

Resolution Direct Vent Gas Fireplace

InstaLLatIOn pLannInG

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

It is important to select the proper length of vent pipe for
the type of termination you choose. It is also important to
note the wall thickness.
FOR HORIZOntaL teRMInatIOn
Select the amount of vertical rise desired. All horizontal run
of venting must have 1/4" rise for every 12" of run towards
the termination below 7Z\x" of vertical rise from floor of fire-
place. With 7Z\x feet or more of vertical rise from the floor
of the fireplace, the horizontal run may be level. NEVER
run vent piping down.
You may use up to three 90° elbows in this vent configura-
tion. Refer to Vertical/Horizontal Termination Configurations
on Page 16.
Horizontal venting which incorporates the twist lock pipe
must be installed on a level plane without an inclining or
declining slope.
FOR VeRtIcaL teRMInatIOn
Measure the distance from the fireplace floor to the ceil-
ing. Add the ceiling thickness, the vertical rise in an attic
or second story, and allow for sufficient vent height above
the roof line.
nOte: You may use two 45° elbows in place of a 90° elbow.
You must follow rise to run ratios when using 45° elbows.
The appliance is approved for use with three 90° elbows
maximum or a combination of 90° and 45° elbows up to
a maximum of 270°.
treatment of firestops and construction of the chase may vary from building
type to building type. these instructions are not substitutes for the requirements
of local building codes. you must follow all local building codes.
when installing in a chase, you should insulate the chase as you would the
outside walls of your home. this is especially important in cold climates.
Insulation should be considered a combustible material. Maintain proper
clearances to all combustible materials.
always maintain minimum clearances around vent systems. the minimum clearances to
combustibles for horizontal vent pipe are 3" at the top* and 1" at the sides and bottom of the vent
system until the pipe penetrates the nearest vertical wall (1" required). a 1" minimum clearance
all around the pipe must be maintained at outside wall and on vertical runs. Do not pack the
open air spaces with insulation or other materials. this could cause high temperatures and may
present a fire hazard.
*unless the vertical run is 7
run is 1" on all sides.
12
feet or higher from floor of fireplace, the clearance for the horizontal
Z\x
never run the vent pipe down. this may
cause excessive temperatures which could
cause a fire.
For two-story applications, firestops are required at each
floor level. If an offset is needed in the attic, additional pipe
and elbows will be required.
You may use a chase with a vent termination with exposed
pipe on the exterior of the house. See Installing A Vent
System in an Outside Chase below. If pipe is enclosed in
chase, it is not exposed.
It is very important that the venting system maintain its bal-
ance between the combustion air intake and the flue gas
exhaust. Certain limitations apply to vent configurations
and must be strictly followed.
InstaLLInG a Vent systeM In an
OutsIDe cHase
A chase is a vertical boxlike structure built to enclose
venting that runs along the outside of a building. A chase
is required for such venting.
VentInG InstaLLatIOn
20300293

Advertisement

Table of Contents
loading

Table of Contents