Verify The Hub Operates Correctly; Led Behavior - HP ProCurve 10/100 12 Installation Manual

Table of Contents

Advertisement

2. Verify the Hub Operates Correctly

Before mounting the hub in its network location, you should first verify that
it is working properly by plugging it into a power source and verifying that it
passes its self test.
1.
N o t e
2.

LED Behavior:

Connect the power cord supplied with the hub to the power connector on
the back of the hub, and then into a properly grounded electrical outlet.
Connect power cord
to power connector
Check the LEDs on the hub.
Hub Port LEDs
Power and Fault LEDs
When the hub is powered on, it performs its diagnostic self test. The self
test occurs by all port LEDs illuminating and going off. The self-test takes
approximately three seconds to complete.
During the self test:
Initially, all the hub and port LEDs are on.
After three seconds, the port LEDs go off.
When the self test completes successfully:
The large Power LED stays on.
The large Fault LED goes off.
The port LEDs go into their normal operational mode.
Installing the Hub
Installation Summary
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve 10/10024Procurve 10/100 hub 24

Table of Contents