Newco Bistro 10 Operating Instructions Manual page 18

Hide thumbs Also See for Bistro 10:
Table of Contents

Advertisement

Programming -Machine Calibration-Cont'd
"Right Auger Speed" (Milk), this is the right or milk product auger delivery duty cycle
value, 1-10, to adjust the auger motor speed for delivering powdered product. This
Right
value should remain at 9 or 10 for the Wolfgang Puck powdered products. Value is set
Auger
at 9 at the factory.
(Milk)
"Right Auger Cal" (Milk), repeat the same steps as "Left Auger Cal" measuring the
product from the right canister (Milk Product) The default value is 90 Grams (3.17 oz)
"Coffee Cal", Insert a container capable of holding 32 or more ounces of water under
delivery area of machine, then press the top left button to start calibration countdown
period of 30 seconds. (Note: if machine is not up to temperature, machine will wait
Dump
until temperature is reached before running calibration cycle, display will read
Valve
"Preparing to Brew") At the end of the calibration cycle, display will change to
"Adjust Coffee Cal" Enter the value measured (Step 5, above right) and press the Upper
Right button when done- screen will change to "Adjust Coffee Cal" again. This is in
case there was a spill or problem during the cycle and the measurement needs to be
repeated- - to repeat press the top right button to restart cycle.
2.10.14
18

Advertisement

Table of Contents
loading

Table of Contents