Lopi Sturbridge Owner's Manual page 35

Direct vent freestanding stove
Hide thumbs Also See for Sturbridge:
Table of Contents

Advertisement

Optional Equipment
3
Attach the wiring harness following the directions below (do not plug in the power cord at this time).
a
Remove one of the nuts holding
the blower in place. Insert the
screw through the eyelet on the
green ground wire and replace.
11/16" Nutdriver
b
Attach the two black wires
labeled "Snap Disk" to the
snap disk (orientation does
not matter).
c
Route the wires labeled "Valve
on/off" and "Solenoid" under
the burner pan to a location
near the gas control valve.
4
Attach the blower cover and rheostat control rod (and knob) following the directions below. Make sure
all of the wiring is placed away from the blower impeller and the bottom of the burner. Use lock ties, if
necessary, to ensure no wires are damaged.
5
Plug the blower in. Let the heater achieve operating temperature and test blower operation.
Travis Industries
d
Insert the molex connector on the power cord through the
hole on the blower cover and attach it to the molex
connector on the wiring harness. With the outer black
casing of the power cord 1" through the hole, install the
strain relief. The strain relief is best installed using pliers to
1 0 0 - 0 1 1 4 2
(for qualified installers only)
e
Attach the black and white wires
labeled "Blower" to the blower
(orientation does not matter).
f
Attach the two black wires labeled
"Rheostat" to the rheostat wires
(orientation does not matter).
d
Attach the rheostat knob.
a
Remove the three screws used
to attach the blower cover from
the back of the stove.
Rheostat Control Rod
Position the blower cover in
place from below, making sure
the rheostat control rod inserts
through the hole on the control
box.
b
5/16" Nutdriver
Attach the
rheostat control
1/16" Allen
rod to the
rheostat.
Rheostat
Do not plug
the heater in
until
installation is
complete.
c
4 0 2 0 9 1 7
3 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents