Inverter Settings And Indications; Operation Mode Switchover - Mitsubishi Electric FR-V5NS Instruction Manual

Sscnet communication option vector inverter
Table of Contents

Advertisement

6. INVERTER SETTINGS AND INDICATIONS

6.1 Operation Mode Switchover

(1) Starting operation mode
Symbol
Switchover Type
1)
SSCNET operation mode
2)
External operation (Pr. 79 = 0 (factory setting))
(2) Operation mode switchover (When Pr. 79 = 0)
Symbol
Switchover Type
External operation →
A
PU operation
PU operation →
B
external operation
SSCNET operation →
C
external operation
External operation →
D
SSCNET operation
SSCNET operation →
E
PU operation
PU operation →
F
SSCNET operation
Power-on
2) (When Pr. 79 = 0 (factory setting))
1)
C
SSCNET
operation
D
When the station number setting is any of 0 to 7 (first to eighth axes).
(SSCNET operation is enabled at completion of initial communication.)
When the FR-V5NS is not fitted or the station number setting is F.
Operate the PU operation key on the PU.
Operate the external operation key on the PU.
Switchover is disabled while power is on. After switching power off, remove the FR-V5NS or set the sta-
tion number to F and switch power on.
Switchover is disabled while power is on. After switching power off, set the station number to any of 0 to
7 and switch power on with the FR-V5NS fitted.
Switchover is disabled while power is on. After switching power off, remove the FR-V5NS or set the sta-
tion number to F, switch power on, and then press the PU button to switch the operation mode.
Switchover is disabled while power is on. After switching power off, set the station number to any of 0 to 7
and switch power on with the FR-V5NS fitted.
A
External
operation
operation
B
E
F
Switchover Method
Switchover Method
14
PU

Advertisement

Table of Contents
loading

Table of Contents