Download Print this page

Hunter 41949-01 Installation Manual page 8

Bath ventilator with light

Advertisement

Available languages

Available languages

New Construction – suspended between joists
B11
Slide the mounting rails into brackets.
B13
Mark position of screws by using holes as a template.
B15
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
011_41949_EngS_2-12-08.indd 8
F
E
F
41949-01 02/12/2008
B12
5/8
1/2
position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
B14
Drill a hole in the center of each outline.
B16
Attach the rails onto the screws.
8
5/8
1/2
1/8" bit
2/12/08 2:43:39 PM

Advertisement

loading

This manual is also suitable for:

Riazzi 83001