Step 5. Optional Blower Kit Wiring; Operating The Appliance - Superior SSDVST-CNM Installation Instructions Manual

Direct vent multi-open series
Table of Contents

Advertisement

Receptacle, Junction Box
and Cover Plate Installation
Junction Box
View Of Right
Bottom Corner Of Unit
Field-provided Metal Junction Box
Cover Plate With Screw
Junction Box
knock-out (2
places each side)
Press snap
bushing into the
knock-out for
control switch
wires.
Figure 45
Step 5. WIRING - OPTIONAL FORCED AIR
BLOWER KIT
FBK-100, FBK-200 and FBK-250 Kits
(See Figure 46 for wiring) -
An electrical receptacle is provided for the
installation of the FBK-100, FBK-200 and FBK-
250 forced air blower kits. Electrical power
must be connected to this receptacle in order
to operate these blowers. Install the blower
kits according to the installation instructions
provided with the kits.
CAUTION
Remove the carton support from
the control compartment before

operating the appliance.

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
26
Ground supply lead must be con-
Outlet Receptacle
nected to the wire attached to the
green ground screw located on the
outlet box. See Figure 46. Failure to
do so will result in a potential safety
hazard. The appliance must be
electrically grounded in accordance
with local codes or, in the absence of
local codes, the National Electrical
Code, ANSI/NFPA 70-latest edition.
(In Canada, the current CSA C22-1
Canadian Electrical Code).
Fireplace
Side
Pilot Burner
Assembly
BL
BL
Optional Control Switch
Electronic Wiring Diagram (Honeywell) Showing Blower Wiring for Optional FBK-100, FBK-200 & FBK-250 Kits
Figure 46
CAUTION
Plug blower
Green
into this
receptacle
Blower
Ground
Tab Intact
Green
Neutral
Ground
Side of
Screw
Receptacle
View A
J-Box Wiring when
Relay Module C/W FBK-250 only. Plug blower
using unit mounted
into J-Box receptacle for FBK-100 or FBK-200
relay module.
application. See View A for J-Box wiring.
BK
W
G
Optional Blower
Junction Box
*OFF/ON Switch
(Integral with
Gas Valve)
Honeywell
Electronic
Gas
Valve
Igniter
Connector
BL
BK
R
BK
BK = BLACK BL = BLUE
BK
R = RED
W
G = GREEN
Schematic Representation Only
CAUTION
Ensure that wires are positioned
away from hot surfaces and sharp
edges.
CAUTION
Do not connect the optional wall
switch to a 120 Volt AC power
supply.
White
Black
Tab
Broken
Red
Hot
Side of
Receptacle
* Leave the OFF/ON switch, which is
integral with the gas valve, in the ON
GROUND
position.
Transformer
**Optional Control Switches: Wall
Switch, Wall Thermostat or Remote
Control Receiver.
24 V
120 VAC
Secondary
Notes:
Primary
1. If any of the original wire as supplied
must be replaced, use Type AWM 105°C
- 18 gage wire ONLY.
2. 120 VAC, 60 Hz - Less than 3 Amps.
W = WHITE
Caution: label all wires prior to
disconnection when servicing controls.
Field Wired
Wiring errors can cause improper and
Factory
dangerous operation.
Wired
G
o r
n u
- d
G
e r
n e
N
e
t u
a r
- l
W
h
e t i
120 VAC - Black
Junction Box
* Wall-mounted
ON/ OFF Blower
Switch or Variable
Speed Control Switch.
J-BOX WIRING FOR
WALL SWITCH
BLOWER CONTROL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssdvst-cneSsdvpf-cnmSsdvpf-cne

Table of Contents