Finishing

A. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances to combustibles as specifi ed. Framing or fi nishing
material closer than the minimums listed must be construct-
ed entirely of noncombustible materials (i.e., steel studs,
concrete board, etc).
Clearance to combustible material under the insert is 1/4
inch (6 mm). Clearance from top of fi replace opening for
combustibles extending 12 inches max. is 12 inches.
• Use leveling legs to raise insert minimum 1/4 inch (6 mm)
above combustible material or outer wrap of factory built
fi rebox.
Combustible facings must not extend behind the insert
surround. For non-combustible material specifi cations
refer to section 1.E.
30
Heat & Glo • Grand-I35, Grand-I35-SP, Supreme-I30, Supreme-I30-SP • 2206-900 Rev. K • 6/11
EXISTING NON-COMBUSTIBLE FACING
Figure 11.1 Clearances to Mantels or other Combustibles
above Appliance
12 IN. MAX.
12 IN. MIN.

Hide quick links: