Rinnai E75CN Installation & Servicing Instructions Manual page 23

High effi ciency condensing gas boiler
Table of Contents

Advertisement

Available languages

Available languages

Water fi lter
fi gure 9a
i
NOTICE
14
E75C
E110C
12
10
8
6
4
2
0
0
UPS 20-48 (25%)
UPS 20-48
pump index lines
The boiler has a self-adjusting and self-protecting control system for the load and the
pump capacity. By this means the temperature difference between the supply and return
water is checked and controlled.
If the installation resistance is over the stated value; the load will be adjusted until
an acceptable temperature difference between supply and return water has been
obtained. If, after this, the temperature difference is still not acceptable then the boiler
will switch off and wait until an acceptable temperature has arisen.
If an unacceptable temperature is detected, the control will repeatedly try to achieve
water fl ow over the boiler. If not the boiler will switch off.
As standard the boiler is provided with a water fi lter in the return pipe of the boiler, so
that debris of the central heating water is prevented from affecting the boiler.
The boiler is designed to be used on pressurized heating systems only.
2
4
Q [gallons/min]
UPS 20-58 (100%)
UPS 20-58
6
8
Resistance E75C
Resistance OSS1
32.3
27.7
23.0
18.5
13.8
9.2
4.6
0
10
12
Resistance E110C
Resistance OSS2
graph 1
23

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

E110cnE75cpE110cp

Table of Contents