LG KG195 Service Manual page 84

Lg kg195 mobile phone service manual
Hide thumbs Also See for KG195:
Table of Contents

Advertisement

3. Test Specification
Measurement item and specification is shown as below :
Test item
TX Maximum Power
Test item
Current Value
USB I/F Check
4. Test Procedure
Test items should be sequential in the table shown as below :
Test item
Start up
TX Power
Current Check
USB I/F Check
5. BackUp Battery Check
BackUp Battery Check must performed after FT process
Back Up Battery Check process is shown as follows :
1. RTC time is automatically set up at FT process(2004/01/01 00:00)
2. Check the RTC time next process
ITEM
Check RTC time
Note : Stingray's BackUp Battery will become empty in 2.5 days. BackUpBattery test must be performed
within two days after soldering VIB FPC.
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
MODE
E-GSM
MODE
MODE
E-GSM
E-GSM
DETAIL
Check the RTC
clock register value
- 83 -
Specification
+24dBm ~ +43dBm
Specification
Max 100£ÌA
Detection of HHP COM port
Procedure
1. Set dummy battery to HHP
2. Link cable is connected (auto power ON)
3. Put Into test mode
1. ARFCN is assign to Mch
2. Set PL to 5(E-GSM)
3. Measure output power
1. Input following PTE command.
Use PTE Command, <Magic Number>
ContTx off
Backlight off
Key Backlight off
SelectBacklight off
2. Check current value
1. Check detection of HHP COM port *
PTE command
HexPeek,700CC008,3,1
6. Repairing
1
Specification
Min05a39a80(HEX)
Max05a4ec00(HEX)
(24hour)
LGE Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents