S T E P
1
Check that the cabinet ac power cord is not connected to an
electrical outlet.
2
Check that the -48Vdc power supply is strapped for
3
Check that all circuit breakers on the Power System Unit
(PSU) are in the OFF position and fuses inserted.
4
If the MSM is installed, check that the Battery Packk is not
connected but inserted into corresponding position. Also
check that the PSU is strapped for MSM operation.
5
Check that each PCB in the system is withdrawn from its
backplane connector.
6
Check that the DIP switch settings for the CIOP board are set
to meet the operating characteristics of the particular data
service terminal to be used to input the installation-dependent
base) into system memory when the standard
data base format is supplied with the SATURN IIE System.
7
Check that each trunk-type PCB (i.e., T M E M , TMIE, TMBA-2
and/or TMBA-4) is properly strapped according to the
operating characteristics of the trunk facility of the Central
Office (CO) or distant PABX.
8
that the intercabinet signal and power/ground cabling
arrangements are complete and all connectors are firmly seat-
ed according to the referenced illustrations (Figures 2.00
through 2.03).
9
Check that Berg Clips are on pins 27 and 28 of unused
signal cable connectors on basic shelf.
Table 2.01 Visual Inspection
VISUAL INSPECTION
Issue 1, May 1986
REFERENCE
SATURN IIE EPABX Installation
Procedures Practice (Section 4.00)
SATURN IIE EPABX Installation
Procedures Practice (Section 4.00)
SATURN IIE EPABX Installation
Procedures Practice (Section 4.00)
SATURN IIE EPABX Installation
Procedures Practice (Section 4.00)
SATURN IIE EPABX Installation
Procedures Practice (Section 4.00)
Figures 2.00 through 2.03