Installation Test Procedures
Table 5.00 Loading Procedures for Operating Disk (Continued)
S T E P
PROCEDURE
5
If the operating disks that were load-
ed did not contain a Siemens-.
prepared data base, refer to SATURN
EPABX Data Base Preparation prac-
tice to define the particular system
data base, and the SATURN EPABX
Customer
Memory
dures practice to input the installation-
d e p e n d e n t d a t a t o t h e s y s t e m
memory.
to the off (c?own) position. After replacement of ClOP PCB, place circuit breaker back
to the on (up) position.
SWITCH
NUMBER
SWITCH ON (CLOSED)
1
Maintenance/ Test
2
Not Used
Baud Rate (see note)
5
One Stop Bit
6
Odd Parity
7
Parity Disabled
8
Seven Bits
NOTE: The following are the baud rate combinations for switches 3 and 4.
OFF
ON
OFF
O N
Update
Proce-
Table 5.01 CIOP DIP Switch Settings
CAUTION:
OFF
OFF
ON
ON
SWITCH OFF (OPZX)
Normal
Not Used
Baud Rate (see no?e)
Two Stop Bits
Even Parity
Parity Enabled
Eight Bits
BAUD RATE
3 0 0
1 2 0 0
2 4 0 0
9 6 0 0
IF VERIFlCAT!ON
IS NOT OBTAINED
5 - 3