Daikin H-Series Engineering Data page 42

H-series cooling only / heat pump split-system room air conditioners
Hide thumbs Also See for H-Series:
Table of Contents

Advertisement

EDUS04-924A
6.
Refilling the refrigerant.
Check the type of refrigerant to be used on the machine nameplate.
Precautions when adding R410A
Fill from the liquid pipe in liquid form.
It is a mixed refrigerant, so adding it in gas form may cause the
refrigerant composition to change, preventing normal operation.
1)
Before filling, check whether the cylinder has a siphon attached or not.
(It should have something like "liquid filling siphon attached" displayed on it.)
• Be sure to use the R410A tools to ensure pressure and to prevent foreign objects entering.
7.
Refrigerant piping work.
7-1 Cautions on pipe handling.
1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender for bending.
7-2 Selection of copper and heat insulation materials.
When using commercial copper pipes and fittings, observe the following:
1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK (0.024 to 0.030Btu/fth˚F (0.035 to 0.045kcal/mh˚C))
Refrigerant gas pipe's surface temperature reaches 230˚F (110˚C) max.
Choose heat insulation materials that will withstand this temperature.
2) Be sure to insulate both the gas and liquid piping and to provide insulation
dimensions as below.
O.D. 5/8 inch (15.9mm)
1-15/16 inch (50mm) or more
Thickness 0.039 inch (1.0mm) (C1220T-O)
3)
Use separate thermal insulation pipes for gas and liquid refrigerant pipes.
In order to protect the environment, be sure to pump down when relocating or disposing of the unit.
1) Remove the valve cap from liquid stop valve and gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a
hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop forced
cooling operation.
Forced cooling operation
1) Press the Forced Operation switch (SW1) to begin forced cooling. Press the Forced Operation switch (SW1) again
to stop forced cooling.
Room Air Conditioners H-Series
Outdoor Unit Installation (4)
Gas side
Liquid side
O.D. 3/8 inch (9.5mm)
Minimum bend radius
1-3/16 inch (30mm) or more
Thickness 0.031 inch (0.8mm) (C1220T-O)
Pump Down Operation
S102
S2
LED-A
SW4
Forced
operation
switch
SW1
Filling a cylinder with an
attached siphon
Stand the cylinder upright
when filling.
There is a siphon pipe
inside, so the cylinder
need not be upside-
down to fill with liquid.
Be sure to
place a cap.
Rain
If no flare cap is
available, cover the
flare mouth with
tape to keep dirt or
water out.
Gas pipe
Gas pipe
insulation
Gas pipe thermal insulation
Liquid pipe thermal insulation
I.D. 0.630-0.787 inch (16-20mm)
I.D. 0.472-0.591 inch (12-15mm)
Thickness 0.393 inch (10mm) Min.
Service port
Gas stop valve
Liquid stop valve
Installation Manual
Filling other cylinders
Turn the cylinder
upside-down when filling.
Wall
Inter-unit wire
Liquid pipe
Liquid pipe
insulation
Finishing tape
Drain hose
Hexagonal
wrench
Close
valve cap
41