Building In; Building Over A Cupboard Or Drawer; Building Over A Kitchen Unit With Door - Zanussi ZGF 759 Instruction Booklet

Gas hob
Table of Contents

Advertisement

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or
drawer it will be necessary to fit a heat resistant board
below the base of the hob on the underside of the
work surface.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the
furniture unit, in order to avoid any contact with the
bottom of the hob which can be heated when it is
operated. The recommended solution is shown in
diagram 1.
The panel fitted under the hob ("a") should be easily
removable to allow easy access if technical assistance
is needed. The space behind the kitchen unit ("b") can
be used for connections.
a
60
b
FO 2044
a) Removable panel
b) Room for connections
1
480
FO 2043
FO 2041
Building over a kitchen unit with oven
If the hob is built into a kitchen unit with an oven
underneath, the recess must have the dimensions
shown in diagrams 2 and 3, and should also incorpo-
rate suitable oven crosspiece supports to ansure an
efficient cooling air circulation.
Diagrams 4 and 5 give two building-in examples.
The electric connection of the hob and the
oven should be carried out separately, for
electrical safety reasons to permit easy
extraction of the oven from the front part of
the kitchen unit.
2
380
140
4
2
50 cm
2
360 cm
550 min.
FO 0198
180 cm
FO 2042
3
5
2
120 cm
2
11

Advertisement

Table of Contents
loading

Table of Contents