EAS00188
ENGINE REMOVAL
EXHAUST PIPES AND MUFFLERS
27 Nm (2.7 m
kg, 19 ft
•
20 Nm (2.0 m
kg, 14 ft
•
27 Nm (2.7 m
kg, 19 ft
•
20 Nm (2.0 m
20 Nm (2.0 m
Order
Removing the exhaust pipes and
mufflers
1
Muffler (left and right)
2
Exhaust pipe (left and right)
3
Gasket
4
Exhaust pipe bracket
Ib)
•
LS
Ib)
•
3
New
New
3
2
Ib)
•
LT
kg, 14 ft
Ib)
•
•
kg, 14 ft
Ib)
•
•
Job/Part
ENGINE REMOVAL
ENGINE
New
3
4
2
3
New
23 Nm (2.3 m
•
Q'ty
Remove the parts in the order listed.
2
2
5
1
For installation, reverse the removal pro-
cedure.
5 - 1
ENG
27 Nm (2.7 m
•
1
LS
New
3
LT
LT
20 Nm (2.0 m
23 Nm (2.3 m
27 Nm (2.7 m
•
12 Nm (1.2 m
kg, 8.7 ft
•
kg, 17 ft
Ib)
•
Remarks
kg, 19 ft
Ib)
•
1
kg, 14 ft
Ib)
•
•
kg, 17 ft
Ib)
•
•
kg, 19 ft
Ib)
•
Ib)
•