Jenn-Air JB36SEFXRB Installation Manual page 21

Bottom mount built-in refrigerator
Hide thumbs Also See for JB36SEFXRB:
Table of Contents

Advertisement

Available languages

Available languages

A
......
o
o
o
2" (5 cm)
B
C
e
D
A. Center board ¼" (6.35 mm) max. above refrigerator
B. Two 2" x 4 " x 32" (5 cm x 10 cm x 81 cm) boards
C. Attach to studs with six #8 x 3" (7.6 cm) screws
D. Compressor
cover
.... .....
...._ e W _''__< _ ' "_ _'
Read all directions before you begin.
IMPORTANT: If you turn the refrigerator on before the water line is
connected, turn the ice maker OFE
Style I - Shutoff Valve Connection
NOTE: If your water line connection does not look like Style 1, see
"Style 2 - Copper Line Connection."
1. Unplug refrigerator or disconnect power supply.
IMPORTANT: Before attaching the tubing to shutoff valve, flush
the main water supply line to remove particles and air in the water
line. Allow enough flow so that water becomes clear. Flushing the
water line may help avoid filters and/or water valves from
becoming clogged.
2. Remove the shipping tape from the gray, coiled water tubing
on the rear of the refrigerator.
3. Remove the short, black plastic tube from the end of the water
line inlet. This tube protects the fitting during shipping only.
4. Thread the provided nut onto the shutoff valve as shown.
................ C
A. Bulb
B. Nut
C. Water tubing
5. Turn shutoff valve ON.
6. Check for leaks. Tighten any nuts or connections (including
connections at the valve) that leak.
7. Plug in the refrigerator or reconnect power.
8. Flush the water system. See "Water System Preparation."
NOTE: Allow 24 hours to produce the first batch of ice. Discard
the first three batches of ice produced. Allow 3 days to completely
fill ice container.
Style 2 - Copper Line Connection
Connecting
to Water
Line
NOTE: If existing water line meets the "Water System
Requirements,"
see "Connecting to Refrigerator."
1. Unplug refrigerator or disconnect power.
2. Turn OFF main water supply. Turn ON nearest faucet long
enough to clear line of water.
3. Locate a 1/2"to 1V4" (1.25 cm to 3.18 cm) vertical cold water
pipe near the refrigerator.
IM PORTANT:
Make sure it is a cold water pipe.
Horizontal pipe will work, but drill on the top side of the
pipe, not the bottom. This will help keep water away from
the drill and normal sediment from collecting in the valve.
4. Determine the length of copper tubing you need. Measure
from the connection on the lower left rear of refrigerator to the
water pipe. Add 7 ft (2.1 m) to allow for cleaning. Use V4"
(6.35 mm) O.D. (outside diameter) copper tubing. Be sure both
ends of copper tubing are cut square.
5. Using a cordless drill, drill a V4"(6.35 mm) hole in the cold
water pipe you have selected.
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression
nut
E. Compression
sleeve
F. Shutoff
valve
G. Packing
nut
6. Fasten the shutoff valve to the cold water pipe with the pipe
clamp. Be sure the outlet end is solidly in the V4" (6.35 mm)
drilled hole in the water pipe and that the washer is under the
pipe clamp. Tighten the packing nut. Tighten the pipe clamp
screws slowly and evenly so washer makes a watertight seal.
Do not overtighten, or you may crush the copper tubing.
7. Slip the compression sleeve and compression nut on the
copper tubing as shown. Insert the end of the tubing into the
outlet end squarely as far as it will go. Screw compression nut
onto outlet end with adjustable wrench. Do not overtighten the
clamp or the sleeve. This will crush the copper tubing.
IMPORTANT: Before attaching the tubing to shutoff valve, flush
the main water supply line to remove particles and air in the water
line. Allow enough flow so that water becomes clear. Flushing the
water line may help avoid filters and/or water valves from
becoming clogged.
8. Turn off the shutoff valve on the water pipe. Coil the copper
tubing.
9. Check for leaks around the saddle valve.
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents