SECTION 3.2
OPERATIONAL ANALYSIS
When the transfer switch returns to the UTILITY side, generator shutdown occurs after approximately one (1)
minute.
Page 3.2-9
TRANSFER SWITCH IN UTILITY
Figure 9. Transfer Switch in UTILITY.
V-TYPE PREPACKAGED
PART 3
TRANSFER SWITCHES