Page 1
Installation and Owner’s Manual Air-cooled, Prepackaged Automatic Standby Generators Models: 04389-3 (6 kW NG, 7 kW LP) 04456-3 (12 kW NG, 12 kW LP) LISTED 04390-3 (13 kW NG, 15 kW LP) GENERAC POWER SYSTEMS, INC. Not intended for use as Primary Power in place of utility or in life-support applications.
READ THIS MANUAL THOROUGHLY models: If any portion of this manual is not understood, contact • 04389-3 – 6 kW NG, 7 kW LP , single-cylinder GH- the nearest Authorized Dealer for starting, operating 410 Engine and servicing procedures.
IMPORTANT SAFETY INSTRUCTIONS Air-cooled 7 kW, 12 kW and 15 kW Generators SAVE THESE INSTRUCTIONS – The manufacturer suggests that these rules for safe operation be copied and posted near the unit’s installation site. Safety should be stressed to all opera- tors and potential operators of this equipment.
IMPORTANT SAFETY INSTRUCTIONS Air-cooled 7 kW, 12 kW and 15 kW Generators • Keep a fire extinguisher near the generator at all times. Extinguishers rated “ABC” by the National ELECTRICAL HAZARDS Fire Protection Association are appropriate for use on the standby electric system. Keep the extin- •...
Section 1 — General Information Air-cooled 7 kW, 12 kW and 15 kW Generators There are LED readouts on the control panel to notify DANGER personnel that one of these faults has occurred. There is also a “System Set” LED that is lit when all ...
Section 1 — General Information Air-cooled 7 kW, 12 kW and 15 kW Generators SYSTEM SET LED DANGER The “System Set” LED is lit when all of the following Gaseous fuels such as natural gas and liquid conditions are true: propane (LP) gas are highly explosive.
Section 1 — General Information Air-cooled 7 kW, 12 kW and 15 kW Generators 8. Refit the brass hose barb fitting to outlet port #1 13. To adjust the system to run on LP fuel, turn and the square headed steel pipe plug to outlet BOTH adjuster screws 1/2 TURN CLOCKWISE.
Section 1 — General Information Air-cooled 7 kW, 12 kW and 15 kW Generators 1.10.2 TRANSFER SWITCH 4. Connect the red battery cable (from starter con- tactor) to the battery post indicated by a positive, POS or (+). 1.10.2.1 7 kW, 12 kW and 15 kW Units 5.
Section 2 — Post Installation Start-up and Adjustments Air-cooled 7 kW, 12 kW and 15 kW Generators • Spilled electrolyte is to be washed down with an 5. Check the engine crankcase oil level and, if neces- acid neutralizing agent. A common practice is to sary, fill to the dipstick FULL mark with the rec- use a solution of 1 pound (500 grams) bicarbonate ommended oil.
Section 2 — Post Installation Start-up and Adjustments Air-cooled 7 kW, 12 kW and 15 kW Generators 7. When certain that utility supply voltage is compat- ible with transfer switch and load circuit ratings, turn OFF the utility power supply to the transfer ...
Section 2 — Post Installation Start-up and Adjustments Air-cooled 7 kW, 12 kW and 15 kW Generators 5. Turn ON the utility power supply to the transfer 5. The fuel regulator is fitted with one (7 kW), or two switch, using the means provided (such as a util- (12 &...
Section 2 — Post Installation Start-up and Adjustments Air-cooled 7 kW, 12 kW and 15 kW Generators 2.7.2 12 KW AND 15 KW UNITS If this procedure or the equipment are not available, locate the nearest Dealer and they can perform the 1.
Section 3 — Operation Air-cooled 7 kW, 12 kW and 15 kW Generators BREAK-IN PROCEDURE 7. Restart the unit. 8. Slowly turn the idle adjust screw to adjust the Once the unit has been installed and all electrical no-load idle frequency to 63-63.5 Hz (with door checks have been made, it is strongly recommended open).
Section 3 — Operation Air-cooled 7 kW, 12 kW and 15 kW Generators 3.2.2 “OFF” POSITION 3.3.1 12 VDC ACCESSORY OUTLET This switch position shuts down the engine. This Your generator is equipped with a 12 VDC accessory position also prevents automatic operation. outlet in the Generator Control Panel.
Section 3 — Operation Air-cooled 7 kW, 12 kW and 15 kW Generators • If utility source voltage drops below about 60 4. Use the manual transfer handle inside the trans- percent of the nominal supply voltage, the sensor fer switch to move the main contacts to their energizes a 15-second timer.
Section 3 — Operation Air-cooled 7 kW, 12 kW and 15 kW Generators 3.7.2 HIGH TEMPERATURE SWITCH 5. Use the manual transfer handle inside the trans- fer switch to move the main contacts back to their This switch’s contacts (Figure 3.3) close if the tem- UTILITY position, i.e., loads connected to the util- perature should exceed approximately 140º...
Section 4 — Maintenance Air-cooled 7 kW, 12 kW and 15 kW Generators 3.7.4 OVERSPEED 3. Install the dipstick; then, remove it again. The oil level should be at the dipstick “Full” mark. If nec- This feature protects the generator from damage by essary, add oil to the “Full”...
Section 4 — Maintenance Air-cooled 7 kW, 12 kW and 15 kW Generators CHANGING THE ENGINE OIL CHANGING THE OIL FILTER Change the engine oil filter as follows: 4.3.1 ENGINE OIL RECOMMENDATIONS 1. With the oil drained, remove the old oil filter by Use oil of American Petroleum Institute (API) Service turning it counterclockwise.
Section 4 — Maintenance Air-cooled 7 kW, 12 kW and 15 kW Generators BATTERY MAINTENANCE Figure 4.7 — 12 kW and 15 kW Engine Air Cleaner The battery should be inspected per the “Service Schedule,” Section 4.13. The following procedure should be followed for inspection: Screw 1.
Section 4 — Maintenance Air-cooled 7 kW, 12 kW and 15 kW Generators When valve clearance is correct, hold the pivot ball Lead-acid batteries present a risk of fire because stud in place with the allen wrench and tighten the they generate hydrogen gas.
Section 4 — Maintenance Air-cooled 7 kW, 12 kW and 15 kW Generators 7. Attach a tag to the engine indicating the viscosity and classification of the oil in the crankcase. 8. Remove the spark plug(s) and spray fogging The exhaust from this product gets extremely agent into the spark plug(s) threaded openings.
Section 4 — Maintenance Air-cooled 7 kW, 12 kW and 15 kW Generators 4.13 SERVICE SCHEDULE ATTENTION: It is recommended that all service work be performed by the nearest Authorized Dealer. SYSTEM/COMPONENT PROCEDURE FREQUENCY X = Action Inspect Change Clean W = Weekly R = Replace as Necessary M = Monthly...
Section 5 — Troubleshooting Air-cooled 7 kW, 12 kW and 15 kW Generators TROUBLESHOOTING GUIDE Problem Cause Correction The engine will not crank. 1. Fuse blown. 1. Replace 15A fuse in generator control panel. 2. Loose, corroded or defective 2. Tighten, clean or replace battery cables.
Section 9 — Mounting Dimensions Air-cooled 7 kW, 12 kW and 15 kW Generators Drawing No. 0D3739-C TYPE HOM CBHOM-F TYPE HOM CBHOM-F TYPE HOM CBHOM-F TYPE HOM CBHOM-F TYPE HOM CBHOM-F TYPE HOM CBHOM-F 120/240v 120/240v 120/240v 120/240v 120/240v 120/240v...
Section 10 – Warranty Air-cooled 7 kW, 12 kW and 15 kW Generators NOTE: This Emission Control Warranty Statement pertains to this product only IF the generator size is 15 kW or below. CALIFORNIA EMISSION CONTROL WARRANTY STATEMENT YOUR WARRANTY RIGHTS AND OBLIGATIONS The California Air Resources Board (CARB) and Generac Power Systems, Inc.
Page 67
Section 10 – Warranty Air-cooled 7 kW, 12 kW and 15 kW Generators EMISSION CONTROL SYSTEM WARRANTY Emission Control System Warranty (ECS Warranty) for 1995 and later model year engines: (a) Applicability: This warranty shall apply to 1995 and later model year engines. The ECS Warranty Period shall begin on the date the new engine or equipment is purchased by/delivered to its original, end-use purchaser/owner and shall continue for 24 consecutive months thereafter.
Page 68
"PREPACKAGED EMERGENCY AUTOMATIC STANDBY GENERATORS" For a period of two years from the date of original sale, Generac Power Systems, Inc. (Generac) warrants that its Guardian generator will be free from defects in material and workmanship for the items and period set forth below. Generac will, at its option, repair or replace any part which, upon examination, inspection and testing by Generac or a Guardian Authorized Warranty Service Dealer, is found to be defective.