SECTION 3.2
V-TYPE PREPACKAGED
PART 3
TRANSFER SWITCHES
OPERATIONAL ANALYSIS
UTILITY RESTORED
Utility voltage is restored and is available to terminals N1 and N2. The utility voltage is sensed by the generators
circuit board. If it is above a preset value for a preset time interval a transfer back to utility power will occur.
Figure 6. Utility Restored, Generator Still Providing Output to Load.
Page 3.2-6