Guardian 4389 Diagnostic Repair Manual page 54

Automatic home standby generators
Hide thumbs Also See for 4389:
Table of Contents

Advertisement

SECTION 3.2
V-TYPE PREPACKAGED
PART 3
TRANSFER SWITCHES
OPERATIONAL ANALYSIS
TRANSFER TO STANDBY
The generator circuit board delivers 12 volts DC to the transfer relay, via terminal 194 and back to the circuit
board via terminal 23. However, circuit board action holds the Wire 23 circuit open and the transfer relay remains
de-energized. On generator startup, an "engine warm-up timer" on the generator circuit board starts timing. When
that timer has timed out, circuit board action completes the Wire 23 circuit to ground. The transfer relay then
energizes, its normally open contacts close, and standby source voltage is delivered to the standby closing coil
via Wires E1 and E2, the transfer relay (TR) contacts, limit switch (XB1), Wire "B". and a bridge rectifier. The
standby closing coil energizes and the main contacts actuate to their "Standby" side.
Figure 4. Transfer Action to Standby Position
Page 3-2.4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

47584456475943904760

Table of Contents