Guardian 4389 Diagnostic Repair Manual page 12

Automatic home standby generators
Hide thumbs Also See for 4389:
Table of Contents

Advertisement

GENERAL INFORMATION
POWER SOURCE AND LOAD LINES
The utility power supply lines, the standby (generator)
supply lines, and electrical load lines must all be
connected to the proper terminal lugs in the transfer
switch. The following rules apply:In 1-phase systems
with a 2-pole transfer switch, connect the two utility
source hot lines to Transfer Switch Terminal Lugs N1
and N2. Connect the standby source hot lines (E1,
E2) to Transfer Switch Terminal Lugs E1 and E2.
Connect the load lines from Transfer Switch Terminal
Lugs T1 and T2 to the electrical load circuit. Connect
UTILITY, STANDBY and LOAD neutral lines to the
neutral block in the transfer switch.
PART 1
Figure 2. Proper Fuel Installation
PREPACKAGED INSTALLATION BASICS
SYSTEM CONTROL INTERCONNECTIONS
Prepackaged home standby generators are equipped
with a terminal board identified with the following
terminals: (a) UTILITY 1, (b) UTILITY 2, (c) 23, and (d)
194. Prepackaged load centers house an identically
marked terminal board. When these four terminals are
properly interconnected, dropout of utility source
voltage below a preset value will result in automatic
generator startup and transfer of electrical loads to the
"Standby" source. On restoration of utility source
voltage above a preset value will result in retransfer
back to that source and generator shutdown.
SECTION 1.2
Page 1-2.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

47584456475943904760

Table of Contents