Rs-485 Communications - Honeywell NetAXS-123 Installation Manual

Access control unit
Hide thumbs Also See for NetAXS-123:
Table of Contents

Advertisement

Installing the NetAXS-123 Panels
Installation
5. When the installation is complete, the closing screen appears:
6. Click
7. Connect the computer to the NetAXS-123 controller with a USB-A to Micro USB-B cable.
8. Turn on the power to the NetAXS-123 controller.
For login information, go to https://192.168.2.150.

3.7.2 RS-485 Communications

If a NetAXS-123 panel is to be placed onto a prexisting RS-485 dropline loop (NetAXS) it must be
setup as the Gateway panel. The interface allows the wiring of a Multidrop communication network of
up to 4,000 feet (1200 m) in length. Only one host converter device per dropline is supported.
NetAXS-123 must be the Gateway panel on an existing NetAXS loop. The NetAXS-123 panel
Note:
cannot be placed as a Downstream panel when the Gateway is a NetAXS system.
DIP switch position 6 on the NetAXS-123 panel selects whether the panel is a Gateway or
Downstream panel. The switch in the OFF position configures the panel as a Downstream panel; ON
configures a Gateway. The panel must be power cycled for a new switch setting to be recognized. DIP
switch positions 1-5 are used to select the panel's address on the network. Refer to
switch setting information.
44
www.honeywell.com
.
Finish
Table 8
for DIP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents