Installing the NetAXS-123 Panels
Installation

3.1.2 Installing over a Gang Box

1. Review the panel layout, cable runs, and power needs.
2. Mount the back of the panel on the gang box.
3. Pull the wires from the gang box through the knockout holes in the base of the enclosure.
4. Perform steps 3 through 10 in the preceding section (
Installing on a
Wall, page 11) to complete
the installation of the panel over a gang box.
NetAXS-123 Access Control Unit Installation Guide, Document 800-05779, Revision A
15