Monthly Preventive Maintenance Checklist; Quarterly Preventive Maintenance Checklist - Raytheon SC125VNV Installation & Maintenance

Washer-extractor cabinet hardmount variable-speed
Table of Contents

Advertisement

Available languages

Available languages

Maintenance

Monthly Preventive Maintenance Checklist

Machine ________________________
Operator _______________________
Disconnect power to the washer-extractor before performing the
1. Each month OR after every 200 hours of operation,
lubricate bearings.
2. Clean the AC drive fins.
3. Determine if V-belts require replacement or adjustment:
a. Check V-belts for uneven wear and frayed edges.
b. Verify that V-belts are properly tensioned.
c. Verify that V-belts are properly aligned.
4. Remove back panel and check hoses for leaks.
5. Clean inlet hose filter screens. Replace if worn or damaged.
6. Tighten motor mounting bolt locknuts and bearing bolt locknuts, if
necessary.
7. Use compressed air to clean lint from motor.
8. Clean interior of washer-extractor, both basket and shell, by wiping with
a water-soaked sponge or cloth.
9. Use compressed air to clean moisture and dust from all electrical
components.
10.
11.
12.
13.

Quarterly Preventive Maintenance Checklist

Checks
Observe All Safety Warnings!
monthly maintenance procedures.
3–8
Month
F232097R1

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Uc125vnv

Table of Contents