Maintenance Checklists - Raytheon SC125VNV Installation & Maintenance

Washer-extractor cabinet hardmount variable-speed
Table of Contents

Advertisement

Available languages

Available languages

Maintenance
Machine ____________________________
Operator ___________________________
1.
Inspect water inlet valve hose connections on the back of the
washer-extractor for leaks.
2.
Inspect steam hose connections for leaks (where
applicable).
3.
Verify that insulation is intact on all external wires and that
all connections are secure.
4.
Check door lock and interlock before starting operation:
a.
Attempt to start the washer with door open.
b.
Close the door without locking it and attempt to start the
washer.
c.
Close and lock the door, start a cycle, and attempt to
open the door while the cycle is in progress.
5.
1.
Clean the AC drive module filters.
2.
Clean the door gasket of all foreign matter.
3.
Clean the washer's top, front, and side panels.
4.
Leave loading door open at the end of each day to allow
moisture to evaporate.
5.
Note: Unload the washer-extractor promptly after each completed cycle to prevent moisture buildup.
Note: Leave loading door open after each completed cycle to allow moisture to evaporate.
Daily Preventive Maintenance Checklist
Checks
Observe All Safety Warnings!
Beginning of Day
Weekly Preventive Maintenance Checklist
Week Of: ________________
End of Day
3–6
Days
1
2
3
4
5
6
7
F232097R1

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Uc125vnv

Table of Contents