Cabling And Socket Installation; Mounting The Socket - Raymarine ST1000 Plus Tiller Pilots Owner's Handbook Manual

Hide thumbs Also See for ST1000 Plus Tiller Pilots:
Table of Contents

Advertisement

Chapter 4: Installing the Tiller Pilot

4.3 Cabling and socket installation

Both power and data are supplied to the tiller pilot via a waterproof
plug and socket. The plug comes ready assembled and the socket can
be mounted in the cockpit area adjacent to the tiller pilot.

Mounting the socket

Install the tiller pilot socket as follows:
1. Attach the template (provided at the back of this handbook) to the
2. Carefully drill a 21 mm (
3. Drill 4 pilot holes (2.5 mm or
+12 V DC (brown, pin 1)
0 V (blue, pin 2)
Socket
Gasket
Cable
Rubber cap
selected bulkhead.
NMEA + (white, pin 6)
NMEA - (green, pin 5)
SeaTalk data (yellow, pin 4)
Floating nut
Plug
Screw
53
/
in) clearance hole for the cable boss.
64
3
/
in) for the self-tapping screws.
32
45
D305-3
Retaining ring
Installed socket
D3296-2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

St2000 plus tiller pilots

Table of Contents