Assembly 4; Scope Of Delivery; Transporting The Appliance - Vaillant ecoTEC exclusive 832 Installation And Maintenance Instructions Manual

Gas wall boilers with condensing appliance technology
Table of Contents

Advertisement

4
Assembly
The Vaillant ecoTEC exclusive is delivered pre-assem-
bled in a package unit.
4.1

Scope of delivery

Check the delivery for completeness and lack of damage
(see Fig. 4.1 and Table 4.1).
3
4
5
6
7
8
Fig. 4.1 Scope of delivery for ecoTEC exclusive
Item
Quantity
Description
1
1
Boiler
2
1
Hanging bracket
Installation and Servicing, Users and
3
3
Flue Installation Instructions
4
1
Installation and connection accessories
5
1
Guarantee Card
6
1
Template
7
4
Copper tails for gas and water pipework
Flow and return service valve, gas service
8
3
valve
9
1
Pressure relief valve/double check valve
10
1
Lower cover (packed inside boiler)
Table 4.1 Scope of supply ecoTEC exclusive
ecoTEC exclusive installation and maintenance instructions / 0020017768_04
4.1.1

Transporting the appliance

Important:
a
With regards to the Manual Handling Opera-
tions, 1992 Regulations, the following lift oper-
ation exceeds the recommended weight for a
one man lift.
General recommendations when handling
• Clear the route before attempting the lift.
2
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible. Do not twist –
reposition feet instead.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
1
• Avoid upper body/top heavy bending - do not lean for-
ward/sideways.
• Recommend wear suitable cut resistant gloves with
good grip to protect against sharp edges and ensure
good grip.
10
• Always use assistance if required.
Removal of carton from delivery van
• Recommend 2 person lift or 1 person with use of sack truck.
• If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
9
• Recommend secure appliance onto truck with suitable
straps.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
• Always use assistance if required.
Carriage of carton from point of delivery to point of
installation – ground floor.
• Recommend 2 person lift or 1 person with use of sack truck.
• If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
• Recommend secure appliance onto truck with suitable
straps.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
• Clear the route before attempting the lift.
• If removing boiler from truck straddle the load and tilt
forwards to facilitate secure grip.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Do not twist – reposition feet instead.
• Take care to avoid trip hazards, slippery or wet sur-
faces and when climbing steps and stairs.
• Always use assistance if required.

Assembly 4

7