Inspection And Maintenance 8; Inspection And Maintenance Intervals; General Inspection And Maintenance Instructions - Vaillant ecoTEC exclusive 832 Installation And Maintenance Instructions Manual

Gas wall boilers with condensing appliance technology
Table of Contents

Advertisement

8
Inspection and maintenance
8.1

Inspection and maintenance intervals

Regular maintenance and service is recommended to
ensure permanent safe and efficient operation of the
boiler. The frequency of maintenance and service de-
pends upon the individual installation conditions and
upon the use the appliance is put to. An inspection must
be performed once a year.
Danger!
d
It is a legal requirement that all maintenance
work be only performed by trained personnel
approved at the time by the Health and Safety
Executive.
Inspection and maintenance work which is im-
properly carried out can lead to injury and ma-
terial damage.
In order to ensure all the functions of the Vaillant appli-
ance over a long period, only genuine Vaillant spare
parts may be used when undertaking maintenance, serv-
ice and repair work. Any spare parts which might be re-
quired are contained in the current Vaillant spare parts
catalogues. Further information can be obtained from
Vaillant Customer Service Centres.
8.2

General inspection and maintenance instructions

Only genuine Vaillant spare parts may be used for in-
spections, maintenance and repair work to ensure the
perfect long-term working order of all functions of your
Vaillant appliance and to prevent the allowed series con-
dition from being changed.
Any spare parts which might be required are listed in
the relevant current spare parts catalogues. Information
can be obtained from Vaillant Service Solutions
(08706060777).
Safety instructions
h
Note!
If it is necessary to keep the main switch on for
certain inspection and maintenance, this is indi-
cated in the description of the maintenance task.
d
Danger!
The supply terminals of the device are under
voltage even if the mains switch is off.
Always perform the following steps prior to maintenance
work:
• Switch off the mains switch.
• Disconnect the device from the mains supply by
pulling the power plug or de-energising the device by
means of a separator with a contact opening of at
least 3 mm (e. g. fuses or circuit breakers).
• Close the gas shut-off valve.
ecoTEC exclusive installation and maintenance instructions / 0020017768_04

Inspection and maintenance 8

• Close the maintenance cocks (if fitted) in the heating
flow and return and the cold water inlet valve on the
inlet combination.
• Remove the front cover from the device.
Always perform the following steps after performing
any maintenance work:
• Open the heating flow and return and the cold water
inlet valve.
• Refill the device, if necessary, with hot water up to
a pressure of between 1.0 and 2.0 bar and vent the
heating system.
• Open the gas shut-off cock.
• Re-connect the appliance to the electrical mains by
inserting the plug into the wall plug socket and switch
the main switch on.
• Check the appliance for gas and water leaks.
• If necessary, refill and re-vent the heating system.
• Reapply the front cover to the device.
• Check all the functions of the appliance.
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecotec exclusive 838

Table of Contents