Convection Blower Replacement - Quadra-Fire MTVERNON-AE-MBK Owner's Manual & Installation

Mt. vernon pellet stove advanced energy (ae)
Hide thumbs Also See for MTVERNON-AE-MBK:
Table of Contents

Advertisement

Mt. Vernon Pellet Stove (AE)
F. Convection Blower Replacement
1. Follow the proper shut down procedures as outlined on
page 30, Section 10.A.
2. Remove the left and right side panels by removing the 4
screws using a Phillips head screw driver. Figure 36.1.
3. Depress the tab on the left side and snap out the power
supply.
You do not need to disconnect any wires.
Figure 36.1.
4. Remove the 2 screws at the bottom of the back panel so
there will be room to remove the blower. Figure 36.1
5. Reach behind the blower and release the latch by push-
ing the top of the latch towards the blower. Figure 36.2.
6. Rock the top of the blower slightly and lift up. The
blower will pass around the control board and out the
left side of the appliance.
7. Disconnect the wire harness from the bottom of the
blower by depressing the tabs on the sides of the con-
nector and then pulling to remove. Figure 36.1.
8. Re-connect wire harness to the new blower.
9. Install replacement blower by placing the bottom flange
into the opening first then rotate blower up into posi-
tion.
10. When the blower is properly positioned the latch will engage
the notch to hold the blower in place. Figure 36.3.
11. Re-secure the back panel, snap the power supply back
in and re-secure the side panel(s).
Remove
Right Side
Panel
Remove
Screws
Figure 36.1
Page 36
epress a and
Snap
S ppl
Remove
Left Side
Panel
Disconnect Wire Harness
from Bottom of Blower
7034-106E
ot h
Figure 36.2
Lat h ngaged
Figure 36.3
t Po er
R
Lat h
September 1, 2008

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtvernon-ae-pmhMtvernon-ae-csbMtvernon-ae-cwl

Table of Contents