Download Print this page

SOLE E35 Owner's Manual page 16

Sears
Hide thumbs Also See for E35:

Advertisement

ASSEMBLY
INSTRUCTIONS
UPPER
See Page 15 for Illustration
1.
Connect the Swing Arm (L-IO) to the left Lower arm (13) and connect the
Swing Arm (R-11) to the right Lower arm (14), and secure them with six Hex
Head Bolts (206), eight Flat Washers (164), four Curved Washers (181 ) and six
Nyloc Nuts (157) using the 13/14mm Wrench (184) and 12/14mm Wrench
(187).
2.
Connect the two wires (L-61 to 60 & R-61 to 59) on the L & R sides together
and store the excess wire, including
plastic connectors,
back inside the con-
sole mast (12). Place the rubber grommets
(75) over the wire on each side
and snap them into the holes of the console mast.
l
#75. Switch Wire Cap
(2 pcs)
#157. 3/8"x 7T
Nyloc Nut (6 pcs)
#164. 3/8"x 19x 1.5T
Flat Washer (8 pcs)
#181.3/8"x 23 x 2T
Curved Washer (4 pcs)
#206. 3/8"x 2-1/4"
Hex Head Bolt (6 pcs)
PLASTIC
See Page 15 for Illustration
Use either screw driver (185 or 186) to secure the following
plastic parts.
1.
Match up the console covers (196 & 197) and secure with three Phillips Head
Screws (139) and two sheet metal screws (142).
2.
Match up the outer Connecting
Arm Covers (109 & 110) with the prei stalled
inner connecting
arm covers (111 & 112). Install the outer covers (109 & 110)
onto the Left and Right Connecting
Arms (8 & 9) and secure each side with a
Phillips Head Screw (139) and two Sheet Metal Screws (142). Make sure you
position
the covers with the arrows pointing
up. If they are installed incor-
rectly, they will break.
3.
Install Sliding Wheel Covers (104) on each side and secure with four Phillips
Head Screws (139).
4.
Install the two Stabilizer Covers (117 and 118) on the middle
stabilizer bar
with two Phillips Head Screws (139).
5.
Install the Front Stabilizer Cover (103) on the front stabilizer with two Phillips
Head Screws (139).
6.
Install the two incline Cover brackets (25), with the hole for mounting
the
plastic cover on the bent tab facing rearward, and secure them on the Incline
Rail Assembly (2) with four Phillips Head Screws (145). Install the Rear incline
bar cover (115) on the rail base with two Screws (139).
7.
Install the Rear Stabilizer Cover (116) on the Rear Stabilizer with four Phillips
Head Screws (139).
8.
Mate the Front Handle Bar Cover (L-105) and the Rear Handle Bar Cover (L-
106) together
on the Left Arm and secure with four Sheet Metal Screws (142)
using the Phillips Head Screw Driver (186). Repeat the same procedure
for #'s
107 & 108on
the right side.
9.
This step to be performed
after the elliptical
power is plugged
in. Elevate the
incline to Level 8 and install the incline Rail front cover (113) up against the
middle stabilizer
tube with four Phillips Head Screws (139).
|
i
#139. M5 x 15ram
Phillips Head Screw
(29 pcs)
#142. 3.5 x 12ram Sheet
Metal Screw (18 pcs)
#145. M6x lOmm
Phillips Head Screw
(4 pcs)
E35 / E95 ELLIPTICAL
14

Hide quick links:

Advertisement

loading

This manual is also suitable for:

E95