7.
7
Attach the Base Cover (84) to the Base (94)
with four #8 x 1/2" Screws (1). Be careful not
to overtighten
the Screws.
With the help of a second person, tip the tread-
mill so that the Base (94) is flat on the floor.
.
Identify the Left Upright Cover (87). Slide the
Left Upright Cover onto the Left Upright (82).
Identify the Left Handrail (78). Attach the Left
Handrail to the Left Upright (82) with a 5/16" x
1 1/2" Patch Bolt (4), two 5/16" x 3/4" Patch
Bolts (5), and two 5/16" Star Washers (9). Do
not tighten the Patch Bolts yet.
8
78
9
5
82
10