Raise Handles And Check; Materials; Cables; Handle - Snapper 1226 Operator's Manual

Large frame snowthrower
Table of Contents

Advertisement

Available languages

Available languages

AssemhJy
REMOVE
PACKAGING
MATERIALS
Note: Follow setup instructions in the order pre=
sented.
1. Open carton completely by cutting each corner from
top to bottom as shown in Figure 3.
,
Open small cardboard box behind snowthrower.
Remove parts bag from inside chute. Remove manu-
al packet. Ensure you have all "Items Included" prior
to assembly.
,
Locate the operator's manual in the manual packet.
Always read and follow the instructions in the opera-
tot's manual. Proper care, performance tips, and
safety information are located in this important docu-
ment.
RAISE HANDLES
AND CHECK
CABLES
Note: "Right"
and "Left" are from the Operating
Position.
1. Cut orange zip ties that secure control cables to
handle assembly. Be careful not to cut or damage the
control cables.
,
3.
Rotate upper handle assembly (Figure 4A) up.
Slide large carriage bolts (A, Figure 4B) into lower holes
and fasten with flange nuts. DO NOT TIGHTEN AT
THIS TIME.
,
,
,
Remove shipping tape from control levers. Make
sure the "Z" bend ends of the control lever cables are
secured in the holes on the control levers (Figure 5).
Make sure auger engage control and traction control
cables route over the top of cable buttons as shown.
Check that all cables can move freely and are not
kinked.
7. Tighten upper and lower nuts in handle with a 1/2"
wrench or deep socket (Figure 4B).
INSTALL
CHUTE ROTATOR
CONTROL
HANDLE
1. Install thin jam nut (A, Figure 6) onto chute rotator
rod. Install chute rotator control handle (B) onto chute
rotator rod turning at least 10 full clockwise rotations.
,
Align chute rotator control handle so it is facing for-
ward and use a 5/8" wrench to tighten jam nut (A)
against chute rotator control handle (B).
3. Slide chute rotator control handle to the right.
Snowthrower - Shipping Position
Upper Handle Figure 4A
Assembly
Figure 3
Upper Handle
Figure 4B
Assembly
\
Control Lever
Figure 5
Jam Nut
Figure 6
Cables
Installation
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

L1226e1695571130.887260

Table of Contents