Preparation Before Installation; Installation - York YUKC 07-18 Installation & Owner's Manual

Minisplit air blower
Table of Contents

Advertisement

DC Inverter R-410A

PREPARATION BEFORE INSTALLATION

• Before doing any work, check the interior power supply cord and the main breaker capacity are sufficient and the
installation area is sufficient and complies with the requirements.
• Check that the power supply available agrees with name plate voltage.
• Electrical work, wiring and cables must be performed in compliance with national and local wiring codes and standard.
• Do not use the extension cables. In the case extended cables are needed, use the terminal block.

INSTALLATION

■ Installation place
The indoor unit must be installed such that there is no short circuit of the cool discharge. Comply to the installation
clearance recommended. Do not put the indoor unit where there is direct sunlight on unit. Make sure the location is
suitable for piping and drainage.
INDOOR UNIT
YUKC 07-12
25
10
ENGLISH
J368-EN.indd 10
A
B
Air Outlet
715
870
915
870
MODEL
A
B
C
18
840
560
335
24
894
590
333
36
990
624
366
48
940
600
376
380
220
175
55
Drain port
Refrigerant pipe
Liquid Side Ø9.53
Gas Side Ø9.0
148
Ø100
Fresh
air inlet
>500mm
mm
D
E
H
REMARK
360
310
677
355
302
860
R-410A
396
340
960
400
340
1,245
Ø25
Refrigerant pipe
>500mm
2/1/07 9:41:10 AM