Summary of Contents for York YCW SERIES LD11554
Page 1
INSTALLATION, OPERATION, & MAINTENANCE YCW Series 2-pipe, 4-pipe 2-pipe, cooling with electric heat YCWE with Bottom Return Option (shown) Notes: 1. For proper operation, control valve must be normally closed. 2. Aquastats provided where required. 3. Electric Heat is available as an option. ***** WARNING TO INSTALLER, SERVICE PERSONNEL AND OWNER ***** Altering the product or replacing parts with non-authorized factory parts voids all warranty or implied warranty and may result in adverse operational performance and/or a possible hazardous...
RECEIVING Material in this shipment has been inspected at the factory and released to the transportation agency in good condition. When received, a visual inspection of all cartons should be made immediately. Any evidence of rough handling or apparent damage should be noted on the delivery receipt and the material inspected in the presence of the carrier’s representative.
Page 4
2. Frame around the perimeter of the unit as required for securing the drywall. See Table 1 below for drywall openings. TABLE 1 - DRYWALL OPENINGS DRYWALL CUTOUT DIM MODEL NUMBER 3YWC 4YWC 6YWC 8YWC 10YWC 12YWC 3. Mount the unit in its permanent location, making sure it is level to insure proper drainage and operation (two 1/2”...
DUCTWORK Ductwork recommendations are as follows: • Insulate to prevent condensation during cooling. • Size to the unit openings are generally acceptable but are determined by the engineering drawings. • Be sure units are ducted per local codes or national codes, as applicable. WIRING Units are provided with wiring diagrams and name- plate data to provide information required for neces-...
Page 6
Table 2 - ELECTRICAL DATA UNIT MODEL 240V 4CWE 6CWE 8CWE 10CWE TOTAL AMPS MIN. CIR. AMPACITY 208V 240V 208V 13.6 11.9 17.8 15.5 13.6 11.9 17.8 15.5 21.9 19.1 26.1 22.7 14.2 12.5 18.4 16.1 22.5 19.7 26.7 23.5 35.0 30.5 15.2...
PIPING All piping connections are 5/8" OD copper tubing (see Fig.4). The supply and return piping must be adequately sized to meet the design water flow requirements as specified for the specific installation. All chilled water piping must be insulated to prevent condensation. It is also recommended that all piping be insulated to prevent freezing when piping is run in an uncondi- tioned space.
Drain Piping Condensate drain lines must be installed with adequate slope away from the unit to assure positive drainage. Since the drain pan is located on the suction side of the blower, a negative pressure exists at the drain pan and a minimum trap of 1-1/2"...
YCW With a Chilled Water Coil The unit will respond to a cooling command from the thermostat by powering a water control valve open. The fan will operate at the speed selected at the thermostat. When the space reaches the temperature setpoint at the thermostat, the cooling valve will close and the fan will continue to operate.
Page 10
MOTOR The blower motor should be cleaned annually and if it has oiling ports, it should be oiled with a good grade of SAE 20 oil. Normally a few drops of oil in each bearing is sufficient. COIL The coil must be kept clean by any of the following methods.
Page 11
FORM 115.20-NOM6 (1106) This Page Intentionally Left Blank JOHNSON CONTROLS...