York YUKC 07-18 Installation & Owner's Manual page 11

Minisplit air blower
Table of Contents

Advertisement

YUKC 18-48
The positioning of ceiling hole and indoor unit and hanging screw bolt:
Install the main body:
Capacity (Btu/h)
12000-18000
24000
30000-48000
J368-EN.indd 11
Main body : A
Distance between bolts: B
J=MxK
Ceiling hole: D
Panel: E
300
Connecting point of
160
refrigerant pipe
(Liquid side ØG)
Connecting point of
refrigerant pipe
(Gas side ØF)
Connecting point of drain pipe
A
B
C
D
1082 1052
1115
1087 1408
1350 1400 1380 1400 1430
Air outlet
Hanging Screw bolt
N-Ø200
70
4-M10 Site configuration
H
60
80
C
Main body: 800
720
630
440
Canvas air passage
450
(Additional purchase)
Ceiling hole 470
Panel
Panel 500
(Additional purchase)
E
F
G
H
12.7
6.35
16
9.53
19
12.7
252
Dust proof net
(Additional purchase)
I
J
K
M
35
930
310
3
ENGLISH
N
4
11
2/1/07 9:41:11 AM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yuhc 18-60

Table of Contents