Preparation Before Installation - York TVHC09-18DSAAAR Installation Manual

Mini
Table of Contents

Advertisement

PREPARATION BEFORE INSTALLATION

• Before doing any work, check the interior power supply cord and the main breaker capacity are su cient and the
installation area is su cient and complies with the requirements.
• Check that the power supply available agrees with nameplate voltage.
• Electrical work, wiring and cables must be performed in compliance with national and local wiring codes and standard.
• Do not use the extension cables. In the case extended cables are needed, use the terminal block.
SELECTION OF THE LOCATION
• Select a place which provides the space around the units as shown in the diagram below.
INDOOR UNIT
Models
A
B
C
D
CAUTION
• Do not install in a place that cannot bear the weight of the unit.
INDOOR UNIT PICTURES
TVHC09-18
Dimension
Models
09 - 12
18
8
ENGLISH
J440-EN.indd 8
09
18
12
12 cm
12 cm
12 cm
230 cm
230 cm
230 cm
12 cm
12 cm
12 cm
15 cm
15 cm
15 cm
W
H
D
790
275
190
940
275
198
OUTDOOR UNIT
Models
09
30 cm
A
200 cm
B
60 cm
C
30 cm
D
12
18
30 cm
30 cm
200 cm
200 cm
60 cm
60 cm
30 cm
30 cm
2/14/08 1:26:39 PM

Advertisement

Table of Contents
loading

Table of Contents