Canopy Installation; Optional Equipment; Blower Kit Installation - Superior UVFR-500 Installation Instructions Manual

Standard series 36" & 42" unvented fireboxes
Hide thumbs Also See for UVFR-500:
Table of Contents

Advertisement

8d Nail
Figure 9
Note: The nailing flange and the area directly
behind the nailing flange is exempt from the
clearances described on the firebox clearance
label.
Step 5. To safely operate the heater with con-
sideration of the mantel clearances the canopy
must be installed.

Canopy Installation

The factory-supplied canopy must be installed
on the firebox for safe operation. See Figure 10 .
UVF-500
Shown
UVF-500
Canopies
UVF-600
Canopies
Attaching
Screws
3 Screws for 500 Models
4 Screws for 600 Models
Figure 10
Step 1. Remove the screws from the top front
frame assembly. There are three (3) screws on
the 500 models and four (4) screws on the 600
models.
Step 2. Align the canopy with the holes in the
top frame.
Step 3. Replace the screws previously removed.
Step 4. Tighten side screws. Make sure the
canopy is level and secure.

OPTIONAL EQUIPMENT

Blower Kit
Circulating Models Only
If you are installing one of the blower kits,
Models FBK-100 or FBK 200, follow Steps 1
through 5, and see the installation instructions
provided with the kit for electrical wiring re-
quirements ( see Figure 11 ) . The firebox must
be connected to main power supply at time of
installation if a forced air kit is to be installed
later. The electrical connections must be made
before the firebox is framed and enclosed in the
finished walls.
This appliance must be electrically grounded in
accordance with local codes or, in the absence
of local codes, the national electrical code,
ANSI/NFPA 70 - (Latest Edition).
CAUTION: ELECTRICAL CONNECTIONS
SHOULD ONLY BE PERFORMED BY A QUALI-
FIED, LICENSED ELECTRICIAN. MAIN POWER
MUST BE OFF WHEN CONNECTING TO MAIN
ELECTRICAL POWER SUPPLY OR PERFORM-
ING SERVICE.
Firebox
Opening
Firebox
Opening
120V
Appliance Junction Box
NOTE: If any of the original wire as supplied
must be replaced, it must be replaced with type
AWM 105 c – 18Ga. wire
Figure 11
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.
Blower Motor
Grounded
to Appliance
Motor Plug
Receptacle

Blower Kit Installation

To install the blower kit, follow Steps 1 thru 5
and refer to Figures 12, 13 and 14 .
Step 1. Locate the blower motor shield.
Step 2. Remove the motor shield by bending it
along the perforation until the tabs break away.
Step 3. With the motor shield removed, place
the blower in the unit with the power cord up
and slide to the back of the unit until the motor
is behind the rear support.
Step 4. Rotate the blower 90 degrees, so that
the discharge is up.
Step 5. Move left side of blower around until it
is in the proper position and bend the retaining
tabs in the bottom of the unit up into the slots
on the blower.
Blower Motor
Motor Shield
Figure 12
Perforation
Tabs
Motor Shield Removed
Figure 13
Rotated Blower In Final Position
Figure 14
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uvfc-500Uvfr-600Uvfc-600

Table of Contents