Detailed Installation Steps; Typical Installation Sequence; Step 1. Framing - Superior SSDVPF-CNE-B Installation Instructions Manual

Ssdv direct-vent gas fireplaces
Hide thumbs Also See for SSDVPF-CNE-B:
Table of Contents

Advertisement

WARNING
Failure to position the parts in
accordance with these diagrams
or failure to use only parts specifi-
cally approved with this appliance
may result in property damage or
personal injury.
AVERTISSEMENT
Risque de dommages ou de
blessures si les pièces ne sont
pas installées conformément à
ces schémas et ou si des pièces
autres que celles spécifiquement
approuvées avec cet appareil sont
utilisées.

DETAILED INSTALLATION STEPS

The appliance is shipped with all gas controls
and components installed and pre-wired.
1. Remove the shipping carton. Remove the
shipping pad, exposing the front glass
door.
2. Open the two latches (located under the
firebox floor) securing the glass door. Re-
move the door by tilting it outward at the
bottom and lifting it up. Set the door aside
protecting it from inadvertent damage. See
Removing Glass Panels on Page 30.
2. Remove the top louvered panel and locate
the pressure relief plates.
3. Lift the pressure relief plates and remove
the cardboard from beneath each plate (be
careful not to damage the white gasket).
See Figure 10.
* NOTE: INSTALLATION DIAGRAMS AND
INSTRUCTIONS SHOW THE FRONT OF THE
APPLIANCE AS THE SIDE WHICH HAS VALVE
ACCESS, EXCEPT WHERE NOTED.
Pressure Relief Plates
Remove Cardboard Before
Using Appliance
Figure 10

TYPICAL INSTALLATION SEQUENCE

The typical sequence of installation is outlined
below. However, each installation is unique
and may result in variations to the steps
described.
See the Page numbers references in the follow-
ing steps for detailed procedures.
Step 1.
(Page 9) Construct the appliance
framing. Position the appliance within
the framing and secure with nailing
flanges.
Step 2.
(Page 12) Route gas supply line to
appliance location.
Step 3.
(Page 13) Install the vent system and
exterior termination.
Step 4.
(Page 25) Field Wiring
.25
a. Millivolt Appliances – Install the
OFF/ON burner control switch and
bring in electrical service line for
forced air-circulating blower (op-
tional equipment).
.25
b. Electronic Appliances – Connect 120
VAC electrical power to the appliance
receptacle.
Step 5.
(Page 26) Install blower kit (optional
equipment).
Step 6.
(Page 27) Make connection to gas
supply.
Step 7.
(Page 28) Verify appliance operation.
Step 8.
(Page 28) Install the logs, decorative
volcanic stone and glowing embers.
Step 9.
(Page 30) Install glass door assem-
blies.
Step 10. (Page 30) Adjust burner primary air
shutter to achieve proper flame ap-
pearance.
Step 11. (Page 31) Install the decorative trim
and hoods.
Step 12. (Page 32) Attach Safety in Operation
Warnings.
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Step 1. FRAMING

Frame these appliances as illustrated in Figures
12 and 13 on Pages 10 and 11. All framing
details must allow for a minimum clearance to
combustible framing members as shown in
Table 6 on Page 8.
If the appliance is to be elevated above floor
level, a solid continuous platform must be
constructed below the appliance.
Headers may be in direct contact with the
appliance top spacers but must not be sup-
ported by them or notched to fit around them.
All construction above the appliance must be
self-supporting. DO NOT use the appliance for
structural support.
Side Nailing Flanges
The fireplace should be secured to the fram-
ing at the side(s) of the appliance using the
factory-provided nailing flanges. Install the 8
nailing flanges as shown in Figure 11 using the
existing screws. Position the fireplace within
the framing. When required, the tabs may be
bent 90 degrees by hand or with the assistance
of a hammer. Use wood screws to secure the
nailing flanges to the framing. See Table 6 on
Page 8 for clearances of framing members
to cabinet parts. The nailing flange itself can
directly contact framing.
Floor Nailing Tabs - Secure the fireplace to the
floor as shown in Figure 11.
SSDVST Shown (SSDVPF - No nailing
flanges on end with glass panel)
Remove these screws and use them
when installing nailing flanges.
Nailing Flanges
Turn nailing tabs down and secure to floor with
8d nails or other appropriate fasteners on both
sides of appliance which do not have viewing
glass panels.
Figure 11 -
Nailing Flanges
9