Gateway E-5400 System Manual page 70

Mid tower
Table of Contents

Advertisement

5
Pull out on the retention tab and slide the control panel unit to the left,
then pull it away from the front of the chassis, taking care not to damage
the control panel cables or connectors as you pull them from the chassis.
To install the new control panel:
1
Feed the control panel connector and cables through the opening in the
front of the chassis.
2
Noting the position of the cables, plug the control panel connector into
J13J2 on the system board.
Retention tab (shown
with part of bracket cut
away for clarity)
Control panel
63

Advertisement

Table of Contents
loading

Table of Contents