Overview; Figure B.1 Upc Port Locations (Primequest 1800E2/1800E) - Fujitsu PRIMEQUEST 1000 Series Hardware Installation Manual

Hide thumbs Also See for PRIMEQUEST 1000 Series:
Table of Contents

Advertisement

PRIMEQUEST 1000 Series Hardware Installation Manual
APPENDIX B UPC Interface
B.1

Overview

The CVCF provides a stable power supply to the system even in the event of a power abnormality or major power
outage.
Through a connection between the CVCF and a UPC port on the main unit with a signal cable, the CVCF can notify
the main unit of abnormal power conditions when it detects them. On receiving such notification, the main unit
performs emergency shutdown processing, and thus can safely stop operation.
The following figure shows the locations of the UPC ports of the PRIMEQUEST 1000 series:
No.
Description
(1)
UPC#1 port
(2)
UPC#0 port

FIGURE B.1 UPC port locations (PRIMEQUEST 1800E2/1800E)

82
C122-H004-07EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 1800e2Primequest 1800e

Table of Contents