Removing the Coverplate

Refer to Figure
1.
Attach the antistatic wrist strap (refer to the instructions on the antistatic wrist strap 
package).
2.
Place the DFE‐Gold module on an antistatic pad on a sturdy flat surface.
Figure 3-1
1 Main board
2 Front panel coverplate screws (2)
3 Coverplate
3.
Remove and save the two coverplate screws fastening the coverplate to the DFE‐Gold 
module front panel.
4.
Remove and save the screw fastening the coverplate to the standoff on the main 
board.
5.
Lift and remove the coverplate from the module and save for possible future use.

Installing the Network Expansion Module

Refer to Figure
1.
Carefully align the two network expansion module connectors with the main board 
connectors. Then press straight down over the two network expansion module 
connectors, applying pressure until they are properly seated.
3‐1 and proceed as follows:

Removing the Coverplate

Ã
Á
3‐2 and proceed as follows:
Installing Optional Network Expansion Modules
À
Â
4 DFE Module front panel
5 Standoff screw
6 Standoff
Matrix DFE-Gold Series Installation Guide 3-3
Ä
Å

Advertisement

Table of Contents
loading

Table of Contents