Switch Rear View - Enterasys C2K122-24 Hardware Installation Manual

Enterasys gigabit ethernet switch installation guide
Hide thumbs Also See for C2K122-24:
Table of Contents

Advertisement

Connecting AC and RPS Power
Figure 3-7
1 AC power cord
3.
Observe the power CPU LED (not shown) located on the front panel. During the 
initialization, the CPU LED will start by illuminating solid amber, then start blinking 
green, then blinking amber, then blinking green again until the end of the 
initialization, and then turns solid green. 
If the switch is a standalone switch, it will take approximately 30 seconds for the 
switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more 
to start up, depending on the number of Member switches in the stack.
3-14 Hardware Installation

Switch Rear View

Á
À
2 AC power connector
Note: If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
additional help, contact Enterasys Networks. Refer to
details
.
Â
3 Connector for external redundant power supply
"Getting
Chapter
4. If you need
Help" on page 1-5 for

Advertisement

Table of Contents
loading

This manual is also suitable for:

Securestack c2 c2k122-24

Table of Contents