Equal Loading; Stage Loading - Carrier 30XA080-500 Controls, Start-Up, Operation, Service And Troubleshooting Instructions

Air-cooled liquid chillers
Table of Contents

Advertisement

DUAL PUMP CONTROL FOR SERIESCHILLER
APPLICATIONS
--If pump control
is required,
the chiller
pump needs to be controlled
by the master chiller only. The
control
of the slave chiller
is directed
through
commands
emitted by the master chillel: The slave chiller has no action in
master/slave
operations;
it shall only verify that CCN commu-
nication
with
its master
is present.
See
the Dual
Chiller
Sequence of Operation
section on page 49.
Use dual chiller control to designate
a lead chiller between
the master and slave chillel: Configure
the Lead/Lag
Baltmce
Select (Configuration
_RSET---)LLBL)
to ENBL to base the
selection
on the Lead/Lag
Balance
Delta
(Configuration
_RSET--+LLBD)
between the master and slave mn hours. If
the run hour difference
between
the master
and the slave
remains less than LLBD,
the chiller designated
as the lead will
remain the lead chillel: The Lead/Lag changeover
between the
master and the slave chiller due to hour balance will occur dur-
ing chiller operating
odd days, such as day 1, &_y 3, and &ty 5
of the month, at 12:00 a.m. If a lead chiller is not designated,
the master chiller will always be designated
the lead chiller
The dual chiller control algorithm
has the ability to be con-
figured for series or parallel operation. To configure chillers in
series, set Configuration--_RSET---_S'ERI
to YES for series
operation,
or NO for parallel operation.
Both the master and
slave chiller must be configmed
the same.
The dual chiller control algorithm
has the ability to delay
the start of the lag chiller in two ways. The Lead Pulldown
Time (Configuration---)RSET---)LPUL)
provides
a field con-
figurable time delay of 0 to 60 minutes.
This time delay gives
the lead chiller a chance to remove the heat that the chilled wa-
ter loop picked up while being inactive during an unoccupied
period. The Lead Pulldown Time pmameter
is a one-time
time
delay initiated after starting the lead chillel: manually or by a
schedule, before checking whether to st_ul an additional
chillel:
This routine provides
the lead chiller an opportunity
to pull
down the loop temperature
before starting another chillel: The
second
time delay. Lead/Lag
Delay
(Configuratiml
_RSET
--+LLDY) is a time delay imposed between the last stage of the
lead chiller
and the start of the lag chillel:
This
prevents
enabling
the lag chiller
until the lead/lag
delay
timer has
expired. See Tables 12 and 13.
Capacity Control-
The
control
system cycles com-
pressors
and positions
the slide valve of each compressor
to
maintain the user-configured
leaving chilled fluid temperature
set point. Entering fluid temperature
is used by the Main Base
Board (MBB)
to determine
the temperature
drop across the
cooler and is used in determining
the optimum
time to add or
subtract capacity. Return fluid temperature,
space temperature
(requires
additional
sensor),
or outdoor-air
temperature
reset
features
can
automatically
reset
the leaving
chilled
fluid
temperatme
set point. It can also be reset fiom an external 4 to
20-mA signal (requires
Energy Management
Module).
Tem-
peratme
leset requires
a temperature
sensor and the Energy
Management
Module.
The control has an automatic
lead-lag feature built in for
circuit and compressor
starts. If enabled, the control will deter-
mine which
circuit
(Configuration--cOPTN--cLLCS=O)
and
compressor
to start to even the wear
The compressor
wear
factor (combination
of starts and run hours) is used to deter-
mine which compressor
starts.
Coml)ressor
Wear Fa_or
= (Coml)mssor
Starts)
+ 0.1
(Coml)ressor
Run Hours)
In this case, the cimuit with the lowest compressor
wear
Nctor is the cimuit that stags first. The following
settings will
determine what cimuit stags first:
Configuratiml
_OPTN---)LLCS=I,
Circuit
A starts
Configuration
_OPTN---)LLCS'=2,
Circuit
B starts
Configuratiml
_OPTN---)LLCS=3,
Circuit C starts
If Minimum
Ix)ad Control
is enabled
(Configuration---)
UNIT---)HGBP=I),
the valve will be opemtiomd
only during
the first stage of cooling.
EQUAL
LOADING
(Configuration
_OPTN---_LOAD=O)
--
The circuit which has started will maintain minimum
stage of
capacity and slide valve fully unloaded;
when additional capac-
ity is required the next circuit with the lowest compressor
wear
factor is st:u-ted with the slide valve at minimum
position. As
additiomd
capacity is required the slide v_dve for a circuit will
be adjusted in approximately
5% increments
to match capacity
requirements.
The control will alternate
between
circuits
to
maintain the same percentage
of capacity on each circuit. See
Fig. 8.
STAGE LOADING
-- If stage-loading
is selected (Configu-
ration _OPTN--+LOAD=I),
the cimuit which has stmted will
gradu_dly load the slide valve to match capacity requirements
until the circuit is fully loaded. Once the circuit is fully loaded
and additional
capacity is required, the control will stmt an ad-
ditional circuit fully unloaded
and gradu_dly unload the circuit
which was lially loaded to match capacity requirements.
The capacity control algorithm
runs every 30 seconds. The
algorithm attempts to maintain the Control Point at the desired
set point. Each time the capacity control _dgorithm runs, the
control reads the entering
and leaving fluid temperatures.
The
control determines
the rate at which conditions
are changing
and calculates
2 variables based on these conditions.
Next, a
capacity ratio is calculated
using the 2 variables to determine
whether or not to make any changes to the current stages of ca-
pacity. This ratio v_due ranges from -100 to +100%. If the next
change of capacity is a compressol:
the control stmts (stops) a
compressor
when the ratio reaches + 100% (-100%). If the next
change of capacity is to reposition
the slide valve, the control
energizes
both slide valve solenoids
when ratio is +60% and
deenergizes
both slide valve solenoids
when ratio is -60%.
[f
inst_dled, the minimum
load valve solenoid will be energized
with the first stage of capacity. Minimum
load valve value is
fixed at 10 tons in the total capacity calculation.
The control
will also use the minimum
load valve solenoid as the last stage
of capacity before turning off the last compressol:
A delay of
90 seconds occurs after each capacity step change. A delay of
3 minutes occm_ after each compressor
capacity step change.
16